PRO-AIR CO.

TESTING, ADJUSTING & BALANCING (TAB); COMMISSIONING; INSPECTING; SOUND & VIBRATION MEASUREMENT SERVICES IN BUILDINGS' ENVIRONMENTAL HVAC SYSTEMS & EQUIPMENT.

2875 Jupiter Park Dr.
Jupiter, FL 33458

ph: 561-741-3552
fax: 561-743-2437
alt: 305-866-8805

SERVICES

HERE IS THE LIST OF PROFESSIONAL SERVICES WE OFFER:

-TAB OF AIR DISTRIBUTION EQUIPMENT & SYSTEMS;

-TAB OF HYDRONIC EQUIPMENT & SYSTEMS (WATER, STEAM AND OTHER LIQUIDS & GASES);

-TAB OF BUILDING SMOKE CONTROL AND AIR PRESSURIZATION SYSTEMS;

-HVAC / MEP SYSTEMS AND EQUIPMENT COMMISSIONING;

-MECHANICAL & ELECTRICAL INSPECTIONS;

-AIR DUCTS LEAKAGE TESTS;

-EXISTING AND NEW HVAC SYSTEMS PERFORMANCE TESTING, ANALYSYS AND TROUBLE-SHOOTING FOLLOWED BY THE EXPERT CONSULTATION & RECOMMENDATION FOR THE BEST AND MOST ECONOMICAL RETROFIT;

-DESIGN DRAWINGS REVIEW, DESIGN AND HVAC LOADS/ENERGY CALCULATION, AND

- SOUND & VIBRATION MEASUREMENT.

  • COMPLETED PROJECTS (Past Experiance)

                                                    

     

                                                                                                                                                              

    COMMERCIAL/OFFICE BUILDINGS, BANKS & HOSPITALS

     

     

    PROJECT: CARNIVAL CRUISE LINES

    3655 NW 87th Ave., MIAMI, FL. 33178-2428

    DESIGN CONSULTANT

    JOHNSON, HERNANDEZ AND ASSOCIATES, INC.

    ORLANDO HERNANDEZ, PE

    TEL: 305-594-0660; FAX: 305-594-0907

    MECHANICAL CONTRACTOR

    THE POOLE & KENT CO., MIMAI, FL.

    TEL: 305-325-1930; FAX: 305-324-0522

    PROJECT MANAGER: CHARLES K. NEESE

    NOTE: There were also additional sub-mechanical contractors for different floors.

    TAB SUPERVISOR

    V. MIKE STANIMIROVIC, PE/TAB Supervisor

    OFFICE BUILDING

    6-story structure with separate Chilled Water Plant which, also supplies existing office building.

    HVAC Systems

    Variable Air Volume Systems. Air volume flow/system static pressure is controlled by DDC and variable frequency drivers. Building Automation System (BAS) is Trane Tracer Summit.

    Air handlers are utilized for smoke removal in conjunction with smoke exhaust and stairwells/elevator shafts pressurization fans.

    Total air flow for air conditioning is 213,400 CFM.

    VAV Terminal Boxes, VAV Diffusers and Air Distribution are Warren Technology; models FBI, ST and Leopard Intellivent.

    HYDRONIC SYSTEM

    -Three water chillers 600 tons/ea; total 1800 tons.

    -Three cooling towers, 600 cooling tons/ea.

    -Primary and Secondary chilled water pumping.

    -Turbine pumps for condenser water pumping.

     

    PROJECT WAS COMPLETED: September 25th, 1996.

     

    PROJECT: EASTERN CARIBBEAN CENTRAL BANK

    BASSATTERRE, ST. KITTS, NWI

    MECHANICAL CONTRACTOR

    CARTER BUILDING ENGINEERING SERVICES, LTD.

    Redhill Rd., Hay Mills, Birmingham B258EY

    England, UK

    Tel: 021-772-4300

    Project Manager: Mr. Paul Minter

    CONSULTING ENGINEERS

    L.W. HARDIE & ASSOC.

    32 Lady Musgrove Rd., Kingston S. Jamaica

    TAB Supervisor: V. Mike Stanimirovic, PE/TAB Supervisor

     

    BANK & OFFICE BUILDING

    Five Variable Air Volume (VAV) systems with total of 44,000 CFM.

    VAV Terminal Units are Metal Aire, model 400TH with Barber-Colman ‘DDC’; also used are Therma-Fuser, model TL-2422-C (independent control).

    Air handlers are utilized for smoke removal in conjunction with smoke exhaust fans.

    Hydronic System: Two Carrier air-cooled chillers, 101 tons each. Two chilled water pumps

    Sound and Vibration tests were performed.

     

    Project completed: July 2, 1994.

     

  • RESORTS, HOTELS & MOTELS PROJECTS

                                                      

     

    PROJECT

     

    ATLANTIS PHASE- III

    PARADISE ISLAND, NASSAU, NP, BAHAMAS

     

    MECHANICAL CONTRACTOR

    CYVSA (CALEFACCION Y VENTILACION, S.A. de C.V.)

    Church & Shirley St., NASSAU, NP, BAHAMAS

    Tel: 242-363-5170/71

    PROLONG CALLE 18 No. 246

    COL. SAN PEDRO DE LOS PINOS

    01180 MEXICO, D.F.

    CONSULTING ENGINEERS

    THOMPSON CO.

    50 Technology Parkway South; Norcross, GA 30092

    TAB Supervisors: V. Mike Stanimirovic & Daniel Stanimirovic

    HOTEL / RESORT & RESIDENCES

    THIS PROJECT ENCOMPASING TWO 22 STORY BUILDINGS AND A LOW RISE FACILITY.

    HVAC SYSTEMS

    CHILLED WATER PLANT CONSISTS OF THE FOLLOWING:

    -PRIMARY / SECONDARY CHILLED WATER LOOPS.

    -FIVE TRANE CENTRIFUGAL CHILLERS 1250 TONS/EA; TOTAL CAPACITY OF 6,250 TONS.

    -CHILLERS ARE COOLED BY WELL WATER THRU FIVE WATER TO WATER PLATE HEAT 

     EXCHANGERS, 1,735 TONS/EA, AND FIVE WELL WATER PUMPS 3,500 GPM/EA.

    -FIVE CONDENSER WATER PUMPS, TOTAL DESIGN FLOW OF 14,000 GPM.

    -FIVE PRIMARY CHILLED WATER PUMPS, TOTAL DESIGN FLOW OF 12,500 GPM.

    -SIX SECONDARY CHILLED WATER PUMPS (VARIABLE SPEED) WITH TOTAL DESIGN FLOW OF 12,080 GPM.

    THERE ARE 40 AIR HANDLING UNITS, NUMEROUS FAN COIL UNITS/BLOWERS AND VENTILATION, LIFE SAFETY AND KITCHEN FANS.

    PROJECT WAS COMPLETED BY 11/15/2007.

    ATLANTIS PHASE-III, THE COVE HOTEL

     

     

     ATLANTIS PHASE-III, THE REEF HOTEL / RESIDENCE

     

     

     

     

     

    PROJECT: RITZ CARLTON HOTEL AND RESIDENCES

                   7 Mile Beach, Grand Cayman, BWI

    MECHANICAL CONTRACTOR

     McGILVRAY (Cayman), Ltd.

     Ritz Carlton Hotel – 7 Mile Beach, Grand Cayman, BWI

    PROJECT MANAGER: Jim Geissinger

    TAB Supervisor: V. Mike Stanimirovic, PE/TAB Supervisor

    HOTEL / RESORT & RESIDENCES FACILITIES

    CONSISTS OF 4 VARIOUS BUILDINGS, INCLUDING A CONVENTION HALL AND A CENTRAL CHILLED WATER PLANT. THE PLANT HAS 1,200 TONS COOLING CAPACITY WITH PRIMARY AND SECONDARY CHILLED WATER LOOP. SECONDARY LOOP IS A VARIABLE FLOW.

    BUILDINGS ARE AIR-CONDITIONED BY AIR HANDLERS, VAV BOXES AND FAN COIL UNITS.

    HVAC IS CONTROLLED BY DDC-BUILDING MANAGEMENT SYSTEM (BMS).

     

    PROJECT COMPLETED: Feb.-2006

     

     

     

    PROJECT: FOUR SEASONS RESORT – EMERALD BAY

                  GREAT EXUMA, BAHAMAS

     

    MECHANICAL CONTRACTOR

    CAREY-FMI / F. McGILVRAY, INC.

    8690 NW 58th ST., MIAMI, FL. 33166

    PROJECT MANAGER: Bill Fallin

     

    DESIGN CONSULTANT

    THOMPSON ENGINEERING

    3475 LENNOX RD. NE, ATLANTA, GA 30326

     

    TAB SUPERVISORS

    DANIEL STANIMIROVIC & ZORAN CVETKOVIC

    HOTEL / RESORT FACILITIES

    CONSISTS OF 23 VARIOUS BUILDINGS, INCLUDING A CONVENTION HALL AND A CENTRAL CHILLED WATER PLANT. THE PLANT HAS 1,300 TONS COOLING CAPACITY WITH PRIMARY AND SECONDARY CHILLED WATER LOOP. SECONDARY LOOP IS A VARIABLE FLOW.

    BUILDINGS ARE AIR-CONDITIONED BY AIR HANDLERS, VAV BOXES AND FAN COIL UNITS.

    HVAC IS CONTROLLED BY DDC-BUILDING MANAGEMENT SYSTEM (BMS).

     

    PROJECT COMPLETED: 03/26/2004

     

     

    PROJECT: MANDARIN ORIENTAL - 5 STAR HOTELS

                         500 BRICKELL KEY DR., MIAMI, FL.

     

    MECHANICAL CONTRACTOR

    HILL YORK CORP.

    2125 South Andrews Ave., FORT LAUDERDALE, FL. 33316

    TEL: 954-525-2971 / FAX: 954-525-2973

    PROJECT MANAGER: MIKE HYET

     

    DESIGN CONSULTANT: CASERTINI ASSOC., INC.

                                  200 S. Orange Ave., Suite-1450, ORLANDO, FL.

     

    TAB SUPERVISOR

    DANIEL STANIMIROVIC

     

    HOTEL FACILITIES

    LARGE MIAMI DOWNTOWN HOTEL WITH CONVENTION HALL, RESTAURANTS AND OTHER FACILITIES.

    WHOLE BUILDING IS COOLED WITH WATER COOLED CHILLERS (CAPACITY OF 3,400 TONS); COMMON AREAS ARE CONDITIONED WITH 30 AIR HANDLERS; GUESTS’ ROOMS CONDITIONED WITH FAN COIL UNITS.

    BUILDING IS PROTECTED WITH SMOKE CONTROL/EVACUATION SYSTEM.

     

    PROJECT WAS COMPLETED: February 2001

     

     

     

    PROJECT: HAMPTON INN HOTEL

                         250 ANDREWS AVE., FORT LAUDERDALE, FL.

     

    MECHANICAL CONTRACTOR

    AIR SERVICE, INC.

    1964 WEST 9th St., RIVIERA BEACH (WPB), FL. 33405

    TEL: 561-842-9778 / FAX: 561-881-7145

    PROJECT MANAGER: KIM GARBARINO

     

    DESIGN CONSULTANT

    STEVEN FELLER, PE, INC.

    500 NE 3rd Ave., FORT LAUDERDALE, FL. 33301

     

    TAB SUPERVISOR

    ZORAN CVETKOVIC

     

    HOTEL FACILITIES

    THIS IS ELEVEN STORY BUILDING. COMMON AREAS ARE CONDITIONED WITH TWO ‘DX’ SPLIT UNITS AND ONE ROOF TOP ‘DX’ UNIT. GUESTS’ ROOMS ARE CONDITIONED WITH PACKAGE ‘DX’ UNITS (PITAC).

    BUILDING IS ALSO PROTECTED WITH SMOKE CONTROL SYSTEM.

     

    PROJECT WAS COMPLETED ON: January 1st, 2002

     

     

    PROJECT

    ATLANTIS PHASE- II

    PARADISE ISLAND, NASSAU, NP, BAHAMAS

     

    MECHANICAL CONTRACTOR

    CIVSA (CALEFACCION Y VENTILACION, S.A. de C.V.)

    PARADISE BEACH RD., PARADISE ISLAND, NASSAU, NP, BAHAMAS

    Tel: 242-363-5170/71

    PROLONG CALLE 18 No. 246

    COL. SAN PEDRO DE LOS PINOS

    01180 MEXICO, D.F.

     

    CONSULTING ENGINEERS

    BLUM CONSULTING ENGINEERS, INC.

    8144 Walnut Hill Lane; Suite-200

    Dallas Texas 75231-4316

     

    TAB Supervisors: V. Mike Stanimirovic & Daniel Stanimirovic

     

    HOTEL / RESORT & CASINO

    THIS PROJECT ENCOMPASING 1.5 MILLION SQUARE FEET OF OCCUPIED SPACE.

    CHILLED WATER PLANT CONSISTS OF THE FOLLOWING:

    -FOUR McQUEY CENTRIFUGAL CHILLERS 1060 TONS/EA AND ONE OF 500 TONS; TOTAL CAPACITY OF 4,740 TONS.

    -CHILLERS ARE COOLED BY WELL WATER THRU THREE WATER TO WATER PLATE HEAT  

     EXCHANGERS, 2280 TONS/EA, AND THREE WELL WATER PUMPS.

    -FIVE CONDENSER WATER PUMPS, TOTAL DESIGN FLOW OF 14,220 GPM.

    -FIVE PRIMARY CHILLED WATER PUMPS, TOTAL DESIGN FLOW OF 11,376 GPM.

    -FOUR SECONDARY CHILLED WATER PUMPS (VARIABLE SPEED) WITH TOTAL DESIGN FLOW OF 12,080 GPM.

    HVAC SYSTEMS CONSYSTS OF 62 AIR HANDLING UNITS, 1500 FAN COIL UNITS AND NUMEROUS VENTILATION, LIFE SAFETY AND KITCHEN FANS.

     

    PROJECT WAS COMPLETED IN NOVEMBER 1998.

    ATLANTIS PHASE-II (ROYAL TOWERS)

    Enter a detailed description of your product or service. You can add as much text as you like, and even add images to illustrate your offering. Tell your visitors why they should buy from you! Add a new section for each product or service.

  •  

      EDUCATIONAL PROJECTS

     

     

    PROJECT: PEMBROKE PINES ACADEMIC VILLAGE & LIBRARY

                         PEMBROKE PINES, FL.

    MECHANICAL CONTRACTOR

    THE POOLE & KENT CO.,-1781 NW North River Dr., MIAMI, FL. 33125

    TEL. /FAX: 305-325-1930 / 305-324-0522

    PROJECT MANAGER: Charles K. Neese

     

    DESIGN / BUILD  CONSULTANT

    THE HASKEL CO. - 111 Riverside Ave., Jacksonville, Fl.

     

    TAB SUPERVISORS

    V. Mike Stanimirovic & Daniel Stanimirovic

     

    EDUCATION FACILITIES

    This Campus consists of seven buildings as following:

    Bldg. ‘A’ is Administration building. Buildings ‘B’, ‘C’, ‘D’ & ‘S’ are classrooms, building ‘G’ is General Purpose, gym, kitchen and dining facilities. Building ‘M’ is the library.

    Whole campus is cooled by chilled water supplied by the chilled water plant.

    Chilled water plant has two Trane centrifugal chillers, 435 tons/each; 870 tons total. Heat is rejected thru two Baltimore Aircoil Cooling Towers 408 cool tower tons/each. Primary chilled water is pumped with two centrifugal pumps, 740 GPM/each. Secondary chilled water is pumped by two centrifugal pumps with variable flow rate as per demand (equipped with VFD’s).

    Air Handling Units (AHU’s): There are 31 AHU’s, some fan coil units (FCU’s) and numerous ventilation fans. Some of  AHU systems are constant (CV) and some are variable air volume flow (VAV). VAV systems are equipped with variable frequency drivers (VFD’s).

    HVAC- Building Automation System: Trane DDC Tracer System. All VAV terminals were set and calibrated thru E-Ware software.

    Project was completed: 10/27/2000

     

     

     

     

     

    PROJECT:

    PEMBROKE PINESCENTRALCAMPUSMIDDLE SCHOOL K-5 & PRE-K

     

    MECHANICAL CONTRACTOR

    THE POOLE & KENT CO.,-1781 NW North River Dr., MIAMI, FL. 33125

    TEL. /FAX: 305-325-1930 / 305-324-0522

    PROJECT MANAGER: Charles K. Neese

     

    INFORMATION PENDING!

     

    PROJECT: HAMMOCKS MIDDLE SCHOOL

                          9889 Hammocks Blvd., MIAMI, FL.

    OWNER

    MIAMI-DADE COUNTY BOARD OF EDUCATION

    PROJECT MANAGER: Charles Gannaway / Tel. no: 305-256-5413

    DESIGN / BUILD - HVAC CONTRACTOR

    COLTEC ENGINEERING, Inc.

    12169 SW 131st Ave., Miami, Fl. 33186

     

    TAB SUPERVISOR: V. Mike Stanimirovic, PE

    EDUCATION FACILITY

    NEW CHILLER PLANT

    Project was completed: 07/17/2003

     

     

    PROJECT: BOB GRAHAM EDUCATION CENTER (STATE SCHOOL ‘C’)

                         15901 N.W. 79th Ave., MIAMI LAKES, FL.

    OWNER

    MIAMI-DADE COUNTY BOARD OF EDUCATION

    PROJECT MANAGER: Roberto Rodriguez  /  Tel. no: 305-995-4827; Fax no: 305-995-1383

     

    DESIGN CONSULTANT

    SDM CONSULTING ENGINEERS, INC.

    4515 Ponce DeLeon Blvd., Coral Gables, Fl. 33146

     

    HVAC CONTRACTOR

    A & M MECHANICAL, INC.

    7495 NW 7th St., Bay-1, Miami, Fl. 33146

    TAB SUPERVISOR

    Daniel Stanimirovic

    PRO-AIR CO. IS EMPLOYED BY MIAMI-DADE BOARD OF EDUCATION, ON PUBLIC SCHOOLS PROJECTS, AS TAB VENDOR  #3443512).

     

    EDUCATIONAL FACILITY

    SINGLE TWO STORY STRUCTURE IS AIR-CONDITIONED BY TWO WATER COOLED CHILLERS (396 tons total). SIX  ‘AHU-VAV’ SYSTEMS AND FOUR ‘AHU-CAV’ SYSTEMS. HEAT IS REJECTED THRU TWO COOLING TOWERS.

    THERE IS KITCHEN VENTILATION SYSTEM AND NUMEROUS VENTILATING FANS.

    HVAC SYSTEMS CONTROL: DDC BY SOUTH FLORIDA CONTROLS CO.; ‘ORCA’ VIEW SOFTWARE (Native BACnet Control Solution) and Delta Control Hardware.

    Project was completed on: 09/15/2003

     

     

    PROJECT: THOMAS JEFFERSON MIDDLE SCHOOL-ADDITION

     

    INFORMATION PENDING!

    OWNER

    MIAMI-DADE COUNTY BOARD OF EDUCATION

    PROJECT MANAGER: Luis Rodriguez / Tel. no: 305-995-4577

    Project was completed: 2004

     

     

    PROJECT: RICHMOND HEIGHTS MIDDLE SCHOOL – ADDITION

                          15015 S.W. 103rd Ave., Miami-Dade, Fl. 33176

     

    OWNER

    MIAMI-DADE COUNTY BOARD OF EDUCATION

    PROJECT MANAGER: Jose Valez  / Tel. no: 305-995-4838

     

    DESIGN CONSULTANT

    L.J. AGUIRRE & ASSOCIATES, PA

    2600 Douglas Rd., Coral Gables, Fl. 33134

     

    HVAC CONTRACTOR

    JORDA MECHANICAL CONTRACTORS

    7591 NW 19th Street., Suite-C, Miami, Fl. 33126

     

    TAB SUPERVISOR

    V. Mike Stanimirovic, PE ; PRO-AIR IS TAB VENDOR.

     

    EDUCATION FACILITY

    One story structure is air-conditioned by two ‘AHU-VAV’ systems. Ventilation (OA) is pre cooled by SF units.

    Cooling is provided by two Air-Cooled Chillers (139 tons total).

    HVAC CONTROLS – BAS (Building Automation System)

    Trane DDC Tracer System.

    Project was completed: 03/21/005

     

    PROJECT: CORAL GABLES SENIOR HIGH SCHOOL-ADDITION

    OWNER

    MIAMI-DADE BOARD OF EDUCATION

    1450 N.E. 2nd Ave., MIAMI, FL. 33132

    PROJECT MANAGER: Michael Krtausch  /  Tel. no: 305-995-4881

     

    DESIGN CONSULTANT

    FRAGA ENGINEERING

    3830 Shipping Ave., Miami, Fl. 33146

     

    HVAC CONTRACTOR

    COLTEC ENGINEERING, Inc.

    12169 SW 131st Ave., Miami, Fl. 33186

     

    TAB SUPERVISOR

    Daniel Stanimirovic, Pro-Air is TAB Vendor to the Board.

     

    EDUCATIONAL FACILITY

    The building is air-conditioned by four ‘AHU-CAV’ and four ‘AHU-VAV’ Systems. Cooling is provided by two water cooled chillers 236 tons total. There is primary chilled water loop with two pumps. Heat is rejected thru two cooling towers. Condenser water loop has two pumps. There are numerous ventilation fans.

     

    HVAC CONTROLS – BAS

    DDC System.

    Project was completed on: 03/25/2005

2875 Jupiter Park Dr.
Jupiter, FL 33458

ph: 561-741-3552
fax: 561-743-2437
alt: 305-866-8805