TESTING, ADJUSTING & BALANCING (TAB); COMMISSIONING; INSPECTING; SOUND & VIBRATION MEASUREMENT SERVICES IN BUILDINGS' ENVIRONMENTAL HVAC SYSTEMS & EQUIPMENT.
2875 Jupiter Park Dr.
Suite-700
Jupiter, FL 33458
United States
ph: 561-741-3552
fax: 561-743-2437
proair31
HERE IS THE LIST OF PROFESSIONAL SERVICES WE OFFER:
-TAB OF AIR DISTRIBUTION EQUIPMENT & SYSTEMS;
-TAB OF HYDRONIC EQUIPMENT & SYSTEMS (WATER, STEAM AND OTHER LIQUIDS & GASES);
-TAB OF BUILDING SMOKE CONTROL AND AIR PRESSURIZATION SYSTEMS;
-HVAC / MEP SYSTEMS AND EQUIPMENT COMMISSIONING;
-MECHANICAL & ELECTRICAL INSPECTIONS;
-AIR DUCTS LEAKAGE TESTS;
-EXISTING AND NEW HVAC SYSTEMS PERFORMANCE TESTING, ANALYSYS AND TROUBLE-SHOOTING FOLLOWED BY THE EXPERT CONSULTATION & RECOMMENDATION FOR THE BEST AND MOST ECONOMICAL RETROFIT;
-DESIGN DRAWINGS REVIEW, DESIGN AND HVAC LOADS/ENERGY CALCULATION, AND
- SOUND & VIBRATION MEASUREMENT.
COMMERCIAL/OFFICE BUILDINGS, BANKS & HOSPITALS
PROJECT: CARNIVAL CRUISE LINES
3655 NW 87th Ave., MIAMI, FL. 33178-2428
DESIGN CONSULTANT
JOHNSON, HERNANDEZ AND ASSOCIATES, INC.
ORLANDO HERNANDEZ, PE
TEL: 305-594-0660; FAX: 305-594-0907
MECHANICAL CONTRACTOR
THE POOLE & KENT CO., MIMAI, FL.
TEL: 305-325-1930; FAX: 305-324-0522
PROJECT MANAGER: CHARLES K. NEESE
NOTE: There were also additional sub-mechanical contractors for different floors.
TAB SUPERVISOR
V. MIKE STANIMIROVIC, PE/TAB Supervisor
OFFICE BUILDING
6-story structure with separate Chilled Water Plant which, also supplies existing office building.
HVAC Systems
Variable Air Volume Systems. Air volume flow/system static pressure is controlled by DDC and variable frequency drivers. Building Automation System (BAS) is Trane Tracer Summit.
Air handlers are utilized for smoke removal in conjunction with smoke exhaust and stairwells/elevator shafts pressurization fans.
Total air flow for air conditioning is 213,400 CFM.
VAV Terminal Boxes, VAV Diffusers and Air Distribution are Warren Technology; models FBI, ST and Leopard Intellivent.
HYDRONIC SYSTEM
-Three water chillers 600 tons/ea; total 1800 tons.
-Three cooling towers, 600 cooling tons/ea.
-Primary and Secondary chilled water pumping.
-Turbine pumps for condenser water pumping.
PROJECT WAS COMPLETED: September 25th, 1996.
PROJECT: EASTERN CARIBBEAN CENTRAL BANK
BASSATTERRE, ST. KITTS, NWI
MECHANICAL CONTRACTOR
CARTER BUILDING ENGINEERING SERVICES, LTD.
Redhill Rd., Hay Mills, Birmingham B258EY
England, UK
Tel: 021-772-4300
Project Manager: Mr. Paul Minter
CONSULTING ENGINEERS
L.W. HARDIE & ASSOC.
32 Lady Musgrove Rd., Kingston S. Jamaica
TAB Supervisor: V. Mike Stanimirovic, PE/TAB Supervisor
BANK & OFFICE BUILDING
Five Variable Air Volume (VAV) systems with total of 44,000 CFM.
VAV Terminal Units are Metal Aire, model 400TH with Barber-Colman ‘DDC’; also used are Therma-Fuser, model TL-2422-C (independent control).
Air handlers are utilized for smoke removal in conjunction with smoke exhaust fans.
Hydronic System: Two Carrier air-cooled chillers, 101 tons each. Two chilled water pumps
Sound and Vibration tests were performed.
Project completed: July 2, 1994.
PROJECT
ATLANTIS PHASE- III
PARADISE ISLAND, NASSAU, NP, BAHAMAS
MECHANICAL CONTRACTOR
CYVSA (CALEFACCION Y VENTILACION, S.A. de C.V.)
Church & Shirley St., NASSAU, NP, BAHAMAS
Tel: 242-363-5170/71
PROLONG CALLE 18 No. 246
COL. SAN PEDRO DE LOS PINOS
01180 MEXICO, D.F.
CONSULTING ENGINEERS
THOMPSON CO.
50 Technology Parkway South; Norcross, GA 30092
TAB Supervisors: V. Mike Stanimirovic & Daniel Stanimirovic
HOTEL / RESORT & RESIDENCES
THIS PROJECT ENCOMPASING TWO 22 STORY BUILDINGS AND A LOW RISE FACILITY.
HVAC SYSTEMS
CHILLED WATER PLANT CONSISTS OF THE FOLLOWING:
-PRIMARY / SECONDARY CHILLED WATER LOOPS.
-FIVE TRANE CENTRIFUGAL CHILLERS 1250 TONS/EA; TOTAL CAPACITY OF 6,250 TONS.
-CHILLERS ARE COOLED BY WELL WATER THRU FIVE WATER TO WATER PLATE HEAT
EXCHANGERS, 1,735 TONS/EA, AND FIVE WELL WATER PUMPS 3,500 GPM/EA.
-FIVE CONDENSER WATER PUMPS, TOTAL DESIGN FLOW OF 14,000 GPM.
-FIVE PRIMARY CHILLED WATER PUMPS, TOTAL DESIGN FLOW OF 12,500 GPM.
-SIX SECONDARY CHILLED WATER PUMPS (VARIABLE SPEED) WITH TOTAL DESIGN FLOW OF 12,080 GPM.
THERE ARE 40 AIR HANDLING UNITS, NUMEROUS FAN COIL UNITS/BLOWERS AND VENTILATION, LIFE SAFETY AND KITCHEN FANS.
PROJECT WAS COMPLETED BY 11/15/2007.
ATLANTIS PHASE-III, THE COVE HOTEL
ATLANTIS PHASE-III, THE REEF HOTEL / RESIDENCE
PROJECT: RITZ CARLTON HOTEL AND RESIDENCES
7 Mile Beach, Grand Cayman, BWI
MECHANICAL CONTRACTOR
McGILVRAY (Cayman), Ltd.
Ritz Carlton Hotel – 7 Mile Beach, Grand Cayman, BWI
PROJECT MANAGER: Jim Geissinger
TAB Supervisor: V. Mike Stanimirovic, PE/TAB Supervisor
HOTEL / RESORT & RESIDENCES FACILITIES
CONSISTS OF 4 VARIOUS BUILDINGS, INCLUDING A CONVENTION HALL AND A CENTRAL CHILLED WATER PLANT. THE PLANT HAS 1,200 TONS COOLING CAPACITY WITH PRIMARY AND SECONDARY CHILLED WATER LOOP. SECONDARY LOOP IS A VARIABLE FLOW.
BUILDINGS ARE AIR-CONDITIONED BY AIR HANDLERS, VAV BOXES AND FAN COIL UNITS.
HVAC IS CONTROLLED BY DDC-BUILDING MANAGEMENT SYSTEM (BMS).
PROJECT COMPLETED: Feb.-2006
PROJECT: FOUR SEASONS RESORT – EMERALD BAY
GREAT EXUMA, BAHAMAS
MECHANICAL CONTRACTOR
CAREY-FMI / F. McGILVRAY, INC.
8690 NW 58th ST., MIAMI, FL. 33166
PROJECT MANAGER: Bill Fallin
DESIGN CONSULTANT
THOMPSON ENGINEERING
3475 LENNOX RD. NE, ATLANTA, GA 30326
TAB SUPERVISORS
DANIEL STANIMIROVIC & ZORAN CVETKOVIC
HOTEL / RESORT FACILITIES
CONSISTS OF 23 VARIOUS BUILDINGS, INCLUDING A CONVENTION HALL AND A CENTRAL CHILLED WATER PLANT. THE PLANT HAS 1,300 TONS COOLING CAPACITY WITH PRIMARY AND SECONDARY CHILLED WATER LOOP. SECONDARY LOOP IS A VARIABLE FLOW.
BUILDINGS ARE AIR-CONDITIONED BY AIR HANDLERS, VAV BOXES AND FAN COIL UNITS.
HVAC IS CONTROLLED BY DDC-BUILDING MANAGEMENT SYSTEM (BMS).
PROJECT COMPLETED: 03/26/2004
PROJECT: MANDARIN ORIENTAL - 5 STAR HOTELS
500 BRICKELL KEY DR., MIAMI, FL.
MECHANICAL CONTRACTOR
HILL YORK CORP.
2125 South Andrews Ave., FORT LAUDERDALE, FL. 33316
TEL: 954-525-2971 / FAX: 954-525-2973
PROJECT MANAGER: MIKE HYET
DESIGN CONSULTANT: CASERTINI ASSOC., INC.
200 S. Orange Ave., Suite-1450, ORLANDO, FL.
TAB SUPERVISOR
DANIEL STANIMIROVIC
HOTEL FACILITIES
LARGE MIAMI DOWNTOWN HOTEL WITH CONVENTION HALL, RESTAURANTS AND OTHER FACILITIES.
WHOLE BUILDING IS COOLED WITH WATER COOLED CHILLERS (CAPACITY OF 3,400 TONS); COMMON AREAS ARE CONDITIONED WITH 30 AIR HANDLERS; GUESTS’ ROOMS CONDITIONED WITH FAN COIL UNITS.
BUILDING IS PROTECTED WITH SMOKE CONTROL/EVACUATION SYSTEM.
PROJECT WAS COMPLETED: February 2001
PROJECT: HAMPTON INN HOTEL
250 ANDREWS AVE., FORT LAUDERDALE, FL.
MECHANICAL CONTRACTOR
AIR SERVICE, INC.
1964 WEST 9th St., RIVIERA BEACH (WPB), FL. 33405
TEL: 561-842-9778 / FAX: 561-881-7145
PROJECT MANAGER: KIM GARBARINO
DESIGN CONSULTANT
STEVEN FELLER, PE, INC.
500 NE 3rd Ave., FORT LAUDERDALE, FL. 33301
TAB SUPERVISOR
ZORAN CVETKOVIC
HOTEL FACILITIES
THIS IS ELEVEN STORY BUILDING. COMMON AREAS ARE CONDITIONED WITH TWO ‘DX’ SPLIT UNITS AND ONE ROOF TOP ‘DX’ UNIT. GUESTS’ ROOMS ARE CONDITIONED WITH PACKAGE ‘DX’ UNITS (PITAC).
BUILDING IS ALSO PROTECTED WITH SMOKE CONTROL SYSTEM.
PROJECT WAS COMPLETED ON: January 1st, 2002
PROJECT
ATLANTIS PHASE- II
PARADISE ISLAND, NASSAU, NP, BAHAMAS
MECHANICAL CONTRACTOR
CIVSA (CALEFACCION Y VENTILACION, S.A. de C.V.)
PARADISE BEACH RD., PARADISE ISLAND, NASSAU, NP, BAHAMAS
Tel: 242-363-5170/71
PROLONG CALLE 18 No. 246
COL. SAN PEDRO DE LOS PINOS
01180 MEXICO, D.F.
CONSULTING ENGINEERS
BLUM CONSULTING ENGINEERS, INC.
8144 Walnut Hill Lane; Suite-200
Dallas Texas 75231-4316
TAB Supervisors: V. Mike Stanimirovic & Daniel Stanimirovic
HOTEL / RESORT & CASINO
THIS PROJECT ENCOMPASING 1.5 MILLION SQUARE FEET OF OCCUPIED SPACE.
CHILLED WATER PLANT CONSISTS OF THE FOLLOWING:
-FOUR McQUEY CENTRIFUGAL CHILLERS 1060 TONS/EA AND ONE OF 500 TONS; TOTAL CAPACITY OF 4,740 TONS.
-CHILLERS ARE COOLED BY WELL WATER THRU THREE WATER TO WATER PLATE HEAT
EXCHANGERS, 2280 TONS/EA, AND THREE WELL WATER PUMPS.
-FIVE CONDENSER WATER PUMPS, TOTAL DESIGN FLOW OF 14,220 GPM.
-FIVE PRIMARY CHILLED WATER PUMPS, TOTAL DESIGN FLOW OF 11,376 GPM.
-FOUR SECONDARY CHILLED WATER PUMPS (VARIABLE SPEED) WITH TOTAL DESIGN FLOW OF 12,080 GPM.
HVAC SYSTEMS CONSYSTS OF 62 AIR HANDLING UNITS, 1500 FAN COIL UNITS AND NUMEROUS VENTILATION, LIFE SAFETY AND KITCHEN FANS.
PROJECT WAS COMPLETED IN NOVEMBER 1998.
ATLANTIS PHASE-II (ROYAL TOWERS)
Enter a detailed description of your product or service. You can add as much text as you like, and even add images to illustrate your offering. Tell your visitors why they should buy from you! Add a new section for each product or service.
EDUCATIONAL PROJECTS
PROJECT: PEMBROKE PINES ACADEMIC VILLAGE & LIBRARY
PEMBROKE PINES, FL.
MECHANICAL CONTRACTOR
THE POOLE & KENT CO.,-1781 NW North River Dr., MIAMI, FL. 33125
TEL. /FAX: 305-325-1930 / 305-324-0522
PROJECT MANAGER: Charles K. Neese
DESIGN / BUILD CONSULTANT
THE HASKEL CO. - 111 Riverside Ave., Jacksonville, Fl.
TAB SUPERVISORS
V. Mike Stanimirovic & Daniel Stanimirovic
EDUCATION FACILITIES
This Campus consists of seven buildings as following:
Bldg. ‘A’ is Administration building. Buildings ‘B’, ‘C’, ‘D’ & ‘S’ are classrooms, building ‘G’ is General Purpose, gym, kitchen and dining facilities. Building ‘M’ is the library.
Whole campus is cooled by chilled water supplied by the chilled water plant.
Chilled water plant has two Trane centrifugal chillers, 435 tons/each; 870 tons total. Heat is rejected thru two Baltimore Aircoil Cooling Towers 408 cool tower tons/each. Primary chilled water is pumped with two centrifugal pumps, 740 GPM/each. Secondary chilled water is pumped by two centrifugal pumps with variable flow rate as per demand (equipped with VFD’s).
Air Handling Units (AHU’s): There are 31 AHU’s, some fan coil units (FCU’s) and numerous ventilation fans. Some of AHU systems are constant (CV) and some are variable air volume flow (VAV). VAV systems are equipped with variable frequency drivers (VFD’s).
HVAC- Building Automation System: Trane DDC Tracer System. All VAV terminals were set and calibrated thru E-Ware software.
Project was completed: 10/27/2000
PROJECT:
PEMBROKE PINESCENTRALCAMPUSMIDDLE SCHOOL K-5 & PRE-K
MECHANICAL CONTRACTOR
THE POOLE & KENT CO.,-1781 NW North River Dr., MIAMI, FL. 33125
TEL. /FAX: 305-325-1930 / 305-324-0522
PROJECT MANAGER: Charles K. Neese
INFORMATION PENDING!
PROJECT: HAMMOCKS MIDDLE SCHOOL
9889 Hammocks Blvd., MIAMI, FL.
OWNER
MIAMI-DADE COUNTY BOARD OF EDUCATION
PROJECT MANAGER: Charles Gannaway / Tel. no: 305-256-5413
DESIGN / BUILD - HVAC CONTRACTOR
COLTEC ENGINEERING, Inc.
12169 SW 131st Ave., Miami, Fl. 33186
TAB SUPERVISOR: V. Mike Stanimirovic, PE
EDUCATION FACILITY
NEW CHILLER PLANT
Project was completed: 07/17/2003
PROJECT: BOB GRAHAM EDUCATION CENTER (STATE SCHOOL ‘C’)
15901 N.W. 79th Ave., MIAMI LAKES, FL.
OWNER
MIAMI-DADE COUNTY BOARD OF EDUCATION
PROJECT MANAGER: Roberto Rodriguez / Tel. no: 305-995-4827; Fax no: 305-995-1383
DESIGN CONSULTANT
SDM CONSULTING ENGINEERS, INC.
4515 Ponce DeLeon Blvd., Coral Gables, Fl. 33146
HVAC CONTRACTOR
A & M MECHANICAL, INC.
7495 NW 7th St., Bay-1, Miami, Fl. 33146
TAB SUPERVISOR
Daniel Stanimirovic
PRO-AIR CO. IS EMPLOYED BY MIAMI-DADE BOARD OF EDUCATION, ON PUBLIC SCHOOLS PROJECTS, AS TAB VENDOR #3443512).
EDUCATIONAL FACILITY
SINGLE TWO STORY STRUCTURE IS AIR-CONDITIONED BY TWO WATER COOLED CHILLERS (396 tons total). SIX ‘AHU-VAV’ SYSTEMS AND FOUR ‘AHU-CAV’ SYSTEMS. HEAT IS REJECTED THRU TWO COOLING TOWERS.
THERE IS KITCHEN VENTILATION SYSTEM AND NUMEROUS VENTILATING FANS.
HVAC SYSTEMS CONTROL: DDC BY SOUTH FLORIDA CONTROLS CO.; ‘ORCA’ VIEW SOFTWARE (Native BACnet Control Solution) and Delta Control Hardware.
Project was completed on: 09/15/2003
PROJECT: THOMAS JEFFERSON MIDDLE SCHOOL-ADDITION
INFORMATION PENDING!
OWNER
MIAMI-DADE COUNTY BOARD OF EDUCATION
PROJECT MANAGER: Luis Rodriguez / Tel. no: 305-995-4577
Project was completed: 2004
PROJECT: RICHMOND HEIGHTS MIDDLE SCHOOL – ADDITION
15015 S.W. 103rd Ave., Miami-Dade, Fl. 33176
OWNER
MIAMI-DADE COUNTY BOARD OF EDUCATION
PROJECT MANAGER: Jose Valez / Tel. no: 305-995-4838
DESIGN CONSULTANT
L.J. AGUIRRE & ASSOCIATES, PA
2600 Douglas Rd., Coral Gables, Fl. 33134
HVAC CONTRACTOR
JORDA MECHANICAL CONTRACTORS
7591 NW 19th Street., Suite-C, Miami, Fl. 33126
TAB SUPERVISOR
V. Mike Stanimirovic, PE ; PRO-AIR IS TAB VENDOR.
EDUCATION FACILITY
One story structure is air-conditioned by two ‘AHU-VAV’ systems. Ventilation (OA) is pre cooled by SF units.
Cooling is provided by two Air-Cooled Chillers (139 tons total).
HVAC CONTROLS – BAS (Building Automation System)
Trane DDC Tracer System.
Project was completed: 03/21/005
PROJECT: CORAL GABLES SENIOR HIGH SCHOOL-ADDITION
OWNER
MIAMI-DADE BOARD OF EDUCATION
1450 N.E. 2nd Ave., MIAMI, FL. 33132
PROJECT MANAGER: Michael Krtausch / Tel. no: 305-995-4881
DESIGN CONSULTANT
FRAGA ENGINEERING
3830 Shipping Ave., Miami, Fl. 33146
HVAC CONTRACTOR
COLTEC ENGINEERING, Inc.
12169 SW 131st Ave., Miami, Fl. 33186
TAB SUPERVISOR
Daniel Stanimirovic, Pro-Air is TAB Vendor to the Board.
EDUCATIONAL FACILITY
The building is air-conditioned by four ‘AHU-CAV’ and four ‘AHU-VAV’ Systems. Cooling is provided by two water cooled chillers 236 tons total. There is primary chilled water loop with two pumps. Heat is rejected thru two cooling towers. Condenser water loop has two pumps. There are numerous ventilation fans.
HVAC CONTROLS – BAS
DDC System.
Project was completed on: 03/25/2005
Copyright 2011 PRO-AIR CO.. All rights reserved.
2875 Jupiter Park Dr.
Suite-700
Jupiter, FL 33458
United States
ph: 561-741-3552
fax: 561-743-2437
proair31